CRUXUpstream OS
← All skills
Workflow Component
Registry: previewQuality lift unmeasuredadvanced

Production exception/deferment queue

Rank sourced production underperformance, downtime, and workover candidates into an exception queue with quantified severity and approval-gated field actions.

Production And Field Operations · Operations · v1

Quality-uplift proof

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • Deal ID
  • Source Documents
  • Surveillance Wells

Optional inputs

  • Basin
  • Deal Name
  • Downtime Days
  • Exception Markdown
  • Material Figures
  • Underperformance Pct

Required source documents

  • Production Csv

Expected outputs

  • Missing Source Checklist
  • Production Exception Queue
  • Source Appendix

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Partially available

Read-only connection

Some declared steps need additional operator access or setup.

  • Owner or operator capability required
Partially available

Partner workspace

Some declared steps need additional operator access or setup.

  • Owner or operator capability required

Approval and blocking gates

Review approval is required before consequential use.

Declared; runtime enforcement pending

This gate is declared but not yet bound to an executable runtime check. Treat it as uncleared.

Blocks: artifact export, external release

Declared; runtime enforcement pending

This gate is declared but not yet bound to an executable runtime check. Treat it as uncleared.

Blocks: field action

Abstentions and limits

Abstention conditions

  • Underperformance Pct is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Downtime Days is missing or unverified: CRUX abstains until the required evidence is supplied and validated.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use for type-curve build/QC (use type-curve-qc-build), monthly volume close (use monthly-close-revenue-run), or field-action dispatch without operations-owner approval. For standalone quantification of deferred production in barrels and dollars ranked by recoverable uptime, use downtime-deferment-queue — this queue flags downtime cues but does not compute the deferred-barrel/dollar recovery value.

Relationships

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

Production exception/deferment queue · CRUX Catalog