CRUXUpstream OS
← All skills
Workflow Component
Registry: previewQuality lift unmeasuredadvanced

Dedicated-gas-to-power scalar screen

Value dedicated-gas power generation (behind-the-meter / data-center offtake) - netback of power revenue less fuel, capacity, O&M, and processing.

Reserves And Subsurface · Underwriting · v1

Quality-uplift proof

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • Capacity Charge Per Mcf USD
  • Cost Estimate
  • Deal ID
  • Dedicated Gas Mmcfd
  • Discount Rate
  • Engineering Study
  • Gas Dedication Agreement
  • Gas Processing Per Mcf USD
  • Heat Rate Btu Per Kwh
  • Henry Hub USD Per Mmbtu
  • Offtake Contract
  • Offtake Years
  • Plant Capex USD Per Kw
  • Power Basis Review
  • Power Channel
  • Power Offtake USD Per Mwh
  • Price Deck
  • Production Forecast
  • Project Finance Leverage Pct
  • Source Documents
  • Source Spans
  • Variable Om Per Mcf USD
  • Waha Basis USD Per Mmbtu

Optional inputs

  • Basin
  • Deal Name
  • Jv Ownership Pct
  • Material Figures
  • Power Markdown

Required source documents

  • Cost Estimate
  • Engineering Study
  • Gas Dedication Agreement
  • Offtake Contract
  • Price Deck
  • Production Forecast
  • Model
  • Production Csv

Expected outputs

  • Power Generation Analysis

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Owner or operator access required

Read-only connection

The declared execution path is not available under this buyer profile.

  • Owner or operator capability required
Owner or operator access required

Partner workspace

The declared execution path is not available under this buyer profile.

  • Owner or operator capability required

Approval and blocking gates

Review approval is required before consequential use.

Declared; runtime enforcement pending

This gate is declared but not yet bound to an executable runtime check. Treat it as uncleared.

Blocks: external release

Abstentions and limits

Abstention conditions

  • Jv Ownership Pct is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Power Markdown is missing or unverified: CRUX abstains until the required evidence is supplied and validated.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use for a standalone gas price/basis bridge, full wellhead or G&P netback, period-by-period load contract, hourly dispatch, capacity-factor or outage forecast, generator/nameplate design, grid/interconnect, PPA legal diligence, emissions/permitting, reserve certification, project-finance DCF, FID, or investment approval. Route price-only work to commercial-pricing-analyzer and full gas-sales netback to gp-netback-reconciliation; use specialist power, engineering, legal, environmental, tax, and finance processes for the rest.

Relationships

Workflow-registry jobs

No workflow relationship is declared.

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

Dedicated-gas-to-power scalar screen · CRUX Catalog