CRUXUpstream OS
← All skills
Outcome
Registry: previewQuality lift unmeasuredadvanced

Dataroom to IC Memo

Turn a supplied diligence folder or data-room inventory into a cited IC memo or committee paper through mapping, claim checks, package export, and persistence.

Models Memos Decks And Artifacts · Approval · v1

Quality-uplift proof

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • Data Room Documents
  • Deal ID
  • Deal Name
  • Source Documents

Optional inputs

  • Assembled At
  • For Skill ID
  • IC Sources
  • Memo Governance
  • Memo Markdown
  • Memo Risks
  • Recommendation
  • Returns
  • Risks
  • Run ID
  • Thesis
  • Top Per Document
  • Valuation

Required source documents

  • Data Room Documents
  • Source Documents
  • Cim
  • Deck
  • Model
  • Other
  • Reserve Report

Expected outputs

  • Dataroom To IC Memo

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Partially available

Read-only connection

Some declared steps need additional operator access or setup.

  • Owner or operator capability required
Partially available

Partner workspace

Some declared steps need additional operator access or setup.

  • Owner or operator capability required

Approval and blocking gates

IC approval is required before consequential use.

No blocking gate is declared in the public contract.

Abstentions and limits

Abstention conditions

  • Thesis is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Recommendation is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Valuation is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Returns is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Risks is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Memo Markdown is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Memo Governance is missing or unverified: CRUX abstains until the required evidence is supplied and validated.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use to verify claims in an already-drafted memo (ic-claims-source-control) or to compile a seller-side data room (data-room-compiler), nor for final deck rendering/delivery — hand the assembled model to crux-render-deck (the render/delivery layer).

Relationships

Workflow-registry jobs

No workflow relationship is declared.

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

Dataroom to IC Memo · CRUX Catalog