CRUXUpstream OS
← All skills
Workflow Component
Registry: previewQuality lift unmeasuredadvanced

ARO & bonding-gap

Produce a cited P&A cost estimate, bonding-shortfall finding, and post-close reserve schedule for operator, HSE, or liability diligence.

Regulatory And Environmental · Diligence · v1

Quality-uplift proof

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • ARO Wells
  • Contract Well Count
  • Deal ID
  • Jurisdiction
  • Source Documents

Optional inputs

  • Active Count
  • ARO Packet Markdown
  • Bay Well Count
  • Blm Election
  • Deal Name
  • Inactive Count
  • La Location Class
  • Nm Election
  • Notable Risks
  • Offshore Well Count
  • Posted Bond USD
  • Problem Well Count
  • Source Spans
  • Total Well Depth Ft
  • Tx Election
  • Well Count

Required source documents

  • ARO Wells
  • Model
  • Other
  • Production Csv

Expected outputs

  • ARO Bonding Packet

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Partially available

Read-only connection

Some declared steps need additional operator access or setup.

  • Owner or operator capability required
Partially available

Partner workspace

Some declared steps need additional operator access or setup.

  • Owner or operator capability required

Approval and blocking gates

Review approval is required before consequential use.

Declared; runtime enforcement pending

This gate is declared but not yet bound to an executable runtime check. Treat it as uncleared.

Blocks: artifact export, external release

Declared; runtime enforcement pending

This gate is declared but not yet bound to an executable runtime check. Treat it as uncleared.

Blocks: artifact export

Abstentions and limits

Abstention conditions

  • ARO Packet Markdown is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Posted Bond USD is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Bay Well Count, Offshore Well Count, Tx Election, Well Count are missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Total Well Depth Ft is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Active Count, Inactive Count, Nm Election are missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Total Well Depth Ft is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Blm Election is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Well Count is missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • Problem Well Count, Well Count are missing or unverified: CRUX abstains until the required evidence is supplied and validated.
  • La Location Class, Well Count are missing or unverified: CRUX abstains until the required evidence is supplied and validated.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use for a full reserve valuation or RBL underwrite, and never treat the result as accounting ARO, legal advice, a regulator-confirmed requirement, or a time-phased funding schedule. An uncoded jurisdiction requires manual rule confirmation.

Relationships

Workflow-registry jobs

No workflow relationship is declared.

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

ARO & bonding-gap · CRUX Catalog